Commercial Property Refurbishment in London: Programme, Phasing and Cost Control

A commercial property refurbishment is usually judged by one thing: is the building ready to let or sell when the market needs it? That makes programme and cost control the two disciplines that matter most. This guide covers how landlords and investors can plan a refurbishment in London so both stay on track.
Start with the survey and the scope
Most cost and time overruns in refurbishment come from what is found behind finishes. Commission measured, condition and services surveys before the scope is fixed, and test the building against energy requirements. For privately rented buildings the direction of travel is covered in our guide to MEES and EPC B by 2031.
Phase the works around the building
Whether the building is empty or part occupied changes everything. A vacant building can be stripped and rebuilt in one sequence. A part-occupied one needs phasing, protected routes and agreed working hours; see our note on refurbishing an occupied building. Fix long-lead items such as lifts, plant and glazing early so they do not control the programme.
Approvals and compliance
Allow time for building control, fire strategy and any landlord or freeholder consents. Our guide to approvals for commercial refurbishment sets out what is usually needed.
Controlling cost
Agree a clear specification and the level of finish (shell, Category A or tenant-ready) before pricing. Our guide to shell and core versus Cat A and Cat B explains the differences.
Hold a sensible contingency and agree how it is released.
Value engineer early, while changes are still cheap.
Control change. Late changes to scope are the main source of avoidable cost.
Choosing a contractor
Involving a main contractor early lets cost and buildability be tested before commitment. See how we approach landlord refurbishment and tenant-ready delivery and commercial fit-out and refurbishment in London.
Berati Construction works with developers, landlords and homeowners across London and the South East. If you are weighing up a project like this, get in touch and we will talk through scope, programme and budget before you commit.