How Long Does a Luxury Home Refurbishment Take in London?

The short answer is that it depends, and any contractor who gives you a firm date before seeing the building is guessing. A luxury refurbishment in prime London is a long, layered programme, and most of the variation comes from things that happen before and after the site is busy. Here is what drives it.
Before the site starts
Surveys, design development, planning or listed building consent where needed, party wall awards and tendering can take months before a contractor mobilises. If the project includes a basement, expect additional design and approvals; see our basement construction timeline. Our guide to party wall agreements explains one common source of delay.
On site: the main stages
Strip-out and enabling works, where hidden defects are often found.
Structure and envelope: steels, openings, roofs, windows and any extension or basement.
First fix of mechanical, electrical, plumbing and smart systems, followed by plastering and drying times.
Second fix and finishes: joinery, stone, decorative work and fittings.
Commissioning, snagging and handover.
Long-lead items set the pace
Bespoke joinery, natural stone, specialist glazing and lighting are often made to order and can take many weeks. Decisions on them need to be made early, or the programme stalls late. Our notes on luxury internal finishes and bespoke joinery and lighting show why.
What helps keep it on programme
A frozen design, early orders for long-lead items, realistic allowances for the unexpected, and one team accountable for the sequence. Read more in our whole-house renovation guide and our work on luxury refurbishment in Kensington. We give programmes only after we have surveyed the property.
Berati Construction works with developers, landlords and homeowners across London and the South East. If you are weighing up a project like this, get in touch and we will talk through scope, programme and budget before you commit.