Design and Build Contract Explained: What It Covers and What to Check Before You Sign

A design and build contract gives one company responsibility for both designing and constructing your project. Instead of appointing an architect and then tendering the build, you appoint a single contractor who takes the brief, develops the design and delivers the finished building for an agreed price. For developers and commercial clients it is often the quickest way to a fixed cost and a single point of accountability.
What the contract is built around
Two documents sit at the centre of a design and build contract. The Employer's Requirements set out what you want: the brief, performance standards, quality, programme and any design you have already developed. The Contractor's Proposals set out how the contractor will meet them: the design, specification and price. The contract then ties the two together, so any gap between what you asked for and what was proposed is something to settle before signing, not on site.
Who carries which risk
The main difference from a traditional contract is design risk. Under design and build, the contractor is responsible for the design it develops, including that it meets the Employer's Requirements and is fit for purpose. Other risks stay with you unless the contract says otherwise, and the most common of these is ground conditions. If the ground is not investigated properly before the price is fixed, unforeseen conditions can still become a cost to the client. Agree early who owns ground, existing-structure and planning risk.
Key terms to read carefully
Contract sum and price certainty. Check what is fixed and what is provisional, and what happens if the Employer's Requirements change.
Changes. Once the price is fixed, every change you make after signing is a variation. Settle the design as far as you can first.
Programme and completion. Look at the completion date, extension of time rules and any liquidated damages for late completion.
Design development and approvals. Understand when your approval is needed and what counts as a change after approval.
Consultants. If you have already appointed an architect or engineer, find out whether they will be novated to the contractor, and what warranties you will receive.
Payment, retention and defects. Check stage payments, any retention held and the length of the defects period after practical completion.
Insurance and warranties. Confirm the cover required and any collateral warranties for funders, purchasers or tenants.
Standard forms
Most UK design and build projects use a standard form such as the JCT Design and Build Contract, amended to suit the project. Standard forms give both sides a familiar framework, but the amendments often matter more than the base form, so have the final version reviewed by your solicitor before signing. Always check which edition is current.
When it works best
Design and build suits projects where the brief is clear, cost certainty matters and the client wants one party responsible. It works particularly well when the contractor is involved early, so buildability and cost are tested while the design can still change. If you are still shaping the design with an architect and want to keep control of every detail, a traditional route may fit better: our guide on design and build versus traditional contracts compares the two, and design and build versus design and tender covers the other common route.
Before you sign
A short checklist: is the brief complete, is the ground understood, are the changes process and approvals clear, is the programme realistic, and do you hold the warranties your funder or buyer will ask for? Berati Construction delivers design and build projects for developers, landlords and homeowners across London and the South East. Talk to us early and we can help you test the brief, programme and cost before the contract is agreed.